ClearMains
10 marks · 150 words
Practice this question
Handwrite your answer the way you would in the real exam, photograph it, and get AI-graded, rubric-based feedback — scores per dimension, strengths, gaps, and what a topper would add.
Handwrite it, get it evaluated →Want the full paper experience instead? Assemble a timed practice paper from the full GS4 question bank.
More on GS4 · Case Studies
Case Study An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular State. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in next two years by 30 June, 2021, since this project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that minimum three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of inspecting team on the ground that it was a minor crack which will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of inspecting team and continue working with same speed and tempo. He informed you that the minister does not want any delay as he wants the Chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is far relative of the minister and he wants him to finish the project. He also gave you hint that your further promotion as additional chief engineer is under consideration with the ministry. However, you strongly felt that the minor crack in the pier of the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor. (a) Under the given conditions, what are the options available to you as a project manager? (b) What are the ethical dilemmas being faced by the project manager? (c) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges? (d) What can be the consequences of overlooking the observation raised by the inspecting team?
Case Study You are the captain of a space exploration mission to Mars. Six months into the journey, a critical life support system malfunctions. After careful analysis, your engineer determines that the system can be repaired, but it requires a specialized part that can only be 3D printed using a rare material. There's enough of this material on board to either print the part or to continue producing essential medication for one of your crew members with a chronic condition. If you choose to repair the life support system, all crew members will survive the journey, but the one crew member will likely suffer severe health complications. If you continue producing the medication, that crew member will remain stable, but the faulty life support system significantly increases the risk of mission failure and potential loss of all lives on board. The crew member in question is your most experienced engineer, crucial for the mission's success on Mars. Earth is too far away to provide immediate assistance, and your decision must be made within 24 hours. Your choice will have profound implications for the mission, the lives of your crew, and potentially the future of space exploration. 1. What are the ethical dilemmas involved in this case? 2. How should a leader balance the ethical principles of non-maleficence and beneficence in this critical situation? 3. What lessons can be learned from this scenario to improve contingency planning and resource allocation?